| 67 | 0 | 13 |
| 下载次数 | 被引频次 | 阅读次数 |
特高压交流电网建设的不断完善使跨省多区域电力资源配置能力得到提升,为解决区域内电力系统间联络线耦合分档和备用容量不足的问题,引入抽水蓄能(简称“抽蓄”)电站作为柔性调控节点,对抽蓄电站参与特高压电网跨省柔性调度进行深入探究。研究计及抽蓄电站运行、多电网负荷和风电出力特征,制定灵活的联络线功率分档策略并添加联络线耦合约束,构建以多电网剩余负荷峰谷差之和与弃风量最小为目标函数的协同调用模型。结果表明,在送电比例Rg分别取RA=0.448、RB=0.552时,电网A、B剩余负荷峰谷差分别下降2 540、1 665 MW,峰谷差之和降低10.2%。在优先消纳风电模式下,弃风率降至0。同时通过调整联络线功率档位验证了模型在特高压环网多场景中应用的潜力。
Abstract:The continuous improvement of UHV AC power grid construction has improved the ability of power resource allocation across provinces and cities in multiple regions. In order to solve the problems of coupled staging and insufficient reserve capacity of connection lines between power systems in the region, pumped storage(referred to as ‘pumped-storage') power station is introduced as a flexible regulation and control node, and the participation of pumped-storage power station in the cross-provincial flexible scheduling of UHV power grid is explored in depth. The study takes into account the operation of pumped storage power station, load and wind power output characteristics of multiple power grids, and formulates a flexible connection lines power shifting strategy and adds connection lines coupling constraints. A coordinated schedule model is established by minimizing the sum of the peak-to-valley difference of the residual loads of multiple power grids and the amount of abandoned wind as the objective function. The results show that the peak-to-valley difference between the remaining loads of grids A and B decreases by 2 540 MW and 1 665 MW respectively, and the sum of the peak-to-valley difference decreases by 10.2% when the transmission ratio Rg is RA=0.448 and RB=0.552 respectively. Under the priority wind power consumption mode, the wind abandonment rate is reduced to 0. Meanwhile, the potential of multi-scenario application of the model in the UHV ring network is verified by adjusting the power slot of the connection lines.
[1] TOBITA H,KATO M,ONO M,et al.Study on cross-area system operation utilizing pumped-storage hydro with bulk penetration of PVs[J].Renewable energy and power quality journal,2018,1:226-231.
[2] BASU M.Multi-region dynamic economic dispatch of solar-wind-hydro-thermal power system incorporating pumped hydro energy storage[J].Engineering applications of artificial intelligence,2019,86:182-196.
[3] 本刊讯.张北柔性直流电网试验示范工程获得国家核准[J].电力与能源,2017,38(6):796.
[4] 曹敏健,胡泽春,孟颖,等.含抽蓄电站与新能源发电的柔性直流系统日前优化调度方法[J].电力系统自动化,2021,45(15):36-44.
[5] 肖朝霞,贾双,朱建国,等.风光储微电网并网联络线功率控制策略[J].电工技术学报,2017,32(15):169-179.
[6] 郭永明.含风电系统的抽水蓄能与直流联络线优化调度研究[D].北京:华北电力大学,2017.
[7] YUAN W L,XIN W P,SU C G,et al.Cross-regional integrated transmission of wind power and pumped-storage hydropower considering the peak shaving demands of multiple power grids[J].Renewable energy,2022,190:1112-1126.
[8] 陈文哲,黄牧涛,李群山,等.考虑断面耦合控制的特高压复杂大电网最大供电能力优化方法[J].水电能源科学,2023,41(11):217-221.
[9] 汪旸,李群山,黄牧涛,等.考虑输电断面耦合与直流稳定支撑的大电网最大供电能力评估方法[J].电网技术,2025,49(4):1524-1531.
[10] HUANG N T,WU Y Y,LU G B,et al.Combined probability prediction of wind power considering the conflict of evaluation indicators[J].IEEE access,2019,7:174709-174724.
[11] 信文鹏.抽水蓄能电站和多风电场跨区域调峰及效益分配研究[D].郑州:郑州大学,2022.
[12] 周凌安,廖胜利,程春田,等.考虑机组组合的梯级水电站跨省区多电网调峰优化调度方法[J].电网技术,2020,44(2):454-465.
基本信息:
DOI:10.20040/j.cnki.1000-7709.2025.20250121
中图分类号:TV743;TV737
引用信息:
[1]刘洋,黄牧涛,史彬.考虑源网荷欠均衡和联络线耦合的特高压电网抽水蓄能跨省柔性调度研究[J].水电能源科学,2025,43(12):209-213.DOI:10.20040/j.cnki.1000-7709.2025.20250121.
基金信息:
国家电网有限公司科技项目(5100-202404010A-1-1-ZN)